SEASIDE LANDSIDE ""DESTROYED^ DIKE '^'y//A\V N.A.P OUTERDAM FOR HYDR N.A.P 3 A thick layer of asphalt being laid on the re paired sea dike. Dike reconstruction Flakkee: Heavily damaged dikes are repaired over a distance of H miles. Legend: 1. Damaged dike. 2. Preparing of the site for a hydraulic filldam. 3. Placing the hydraulic fill. 4. Shaping of the sand body for a new dike. 5. Final cross-section with the asphalt- facing being laid. Thickness of asphalt layer 0.1 metre at the top and OA metre at the toe). STONE HYDRAULIC FILL N.A.P WOODEN SHEET FACING OF CLAY 39

Krantenbank Zeeland

Watersnood documentatie 1953 - brochures | 1954 | | pagina 41