SEASIDE
LANDSIDE
""DESTROYED^
DIKE
'^'y//A\V
N.A.P
OUTERDAM FOR HYDR
N.A.P
3
A thick layer of asphalt being laid on the re
paired sea dike.
Dike reconstruction Flakkee: Heavily
damaged dikes are repaired over a
distance of H miles.
Legend:
1. Damaged dike.
2. Preparing of the site for a hydraulic
filldam.
3. Placing the hydraulic fill.
4. Shaping of the sand body for a new
dike.
5. Final cross-section with the asphalt-
facing being laid.
Thickness of asphalt layer 0.1
metre at the top and OA metre at
the toe).
STONE
HYDRAULIC FILL
N.A.P
WOODEN SHEET
FACING OF
CLAY
39